Site Overlay

Residential

We Take Pride In Your Driveway

At Turbo Seal LLC we take great pride in the care taken during the driveway sealcoating process.

Edging

First we edge the driveway by cutting back all of the grass around the driveway. Then we prepare the  surface by sweeping it to ensure proper adhesion of the sealcoating.

Edging prior to driveway sealcoating

Crack Filling

Next we router and fill the cracks in the driveway.  Hot rubber crack sealer is applied at extremely high temperatures to get deep into the crack. As the rubber cools it solidifies but stays flexible so it can expand and contract with the thermal movements of the asphalt.

Crack filling before driveway sealcoating

Driveway Sealcoating

Once the time is taken to prepare the surface driveway sealcoating is applied using a spray method over the large areas with a “rich” flat black coat.  The edges are brushed in by hand to ensure exceptional coverage and a precise edge.  As a general rule sealed pavement should never have a shine or appear to be wet.

spraying driveway sealcoating

The driveway sealcoating will seal the porous surface. Once dried (average of 24 hours), it forms a tough, protective layer that protects your pavement investment from the elements and keeps the surface looking new.

finished driveway sealcoating

CALL TODAY FOR A FREE ESTIMATE

612-597-6006